[Ferro-Alloys.com]Merafe Resources has lifted attributable ferrochrome production from the Glencore-Merafe chrome venture by 3% year-on-year to 92 000 t in the quarter ended December 31.
	
		The company said in a report on Friday that the improved output was the result of the start-up of Project Lion II, which was partially offset by additional planned maintenance on other furnaces operated by the venture.
	
		Merafe sold 85 000 t of ferrochrome over the period at an average benchmark price of $1.15/lb, while production levels for the three months had averaged 88% of operating capacity utilisation.
	
		“Our attributable ferrochrome sales volumes were 18% lower in the fourth quarter compared with the corresponding 2013 period, as a result of weaker demand and logistical constraints. ,” it outlined.
	
		Meanwhile, the 2014 full-year ferrochrome production volumes were 5% higher than the prior year, averaging 84% of operating capacity utilisation.
	
		The Johannesburg-listed group produced 334 000 t of ferrochrome in the 12 months ended December 31, selling 316 000 t at an average European benchmark price of $1.18/lb.
	
		“The ramp-up of Project Lion II is on track and is expected to reach full capacity by mid-2015,” it outlined.
	
                    Copyright © 2013 Ferro-Alloys.Com. All Rights Reserved. Without permission, any unit and individual shall not copy or reprint!
                
                - [Editor:sunzhichao]



 Save
 Save Print
 Print Daily News
 Daily News Research
 Research Magazine
 Magazine Company Database
 Company Database Customized Database
 Customized Database Conferences
 Conferences Advertisement
 Advertisement Trade
 Trade















 Online inquiry
Online inquiry Contact
 Contact

Tell Us What You Think